Two unusual projects to brighten up February

 

 

 

 

 

 

 

 

 

As well as our run of the mill (if you can call them that) projects, we often get asked to make unusual objects such as the oval “magic” mirrors and the twin Tipi model shown above. The mirrors were commissioned by an artist for an installation in Italy and had to feature the famous “Mirror, mirror on the wall…” wording in raised gold script. The Tipi model was produced for an events company who wanted to illustrate the exciting and inspirational space created by the twin tent set up.

Comments are closed
Our Latest Projects | Modelmakers | Tidal Lagoon Turbines Model – 1:500 scale

Cut-away view of turbines and sluice gates

Designed and constructed within two weeks for a presentation at the House of Commons, the main problem we had with this model wasn’t the tight deadline but how best to show an underwater view of the power generating turbines at the heart of this renewable energy project. We also had to illustrate different water levels on the inside and seaward side of the lagoon structure. Our solution was to create the water as a thin clear layer with a sprayed on rippled, surface finish and then cut out large viewing “windows” on either side of the turbine structure. This allowed clear low angle views through the turbines as can be seen from the inset pic above.

Comments are closed
Our Latest Projects | Modelmakers | Half Mini Display - August 2011

 Half Mini Display

 

 

 

 

 

 

 

 

 

We created this half Mini as the final piece of an in-store green energy display for a large Garden Centre/DIY chain. The model is actually a mock up of an Electric Mini and illustrates how electric vehicles can be charged at home using a standard off-the-shelf charger, available in store. If you look at the image on the left you can see where the cable plugs into the vehicle via what would normally be the petrol filler cap. Apart from creating the vehicle we also had to organize and apply the specially designed vinyls. The client was really pleased with the finished result, particularly as we’d had to rush to get it finished before the bank holiday weekend deadline. As a final point we’d like to just add that this is the first and only time we’ve ever done half a job!

Comments are closed