Fully interactive model for Notting Hill Sales.

One of our existing clients recommended our services to Notting Hill Sales which lead to us producing this fully interactive sales model for one of their major developments in London. The interactive element allows touch-screen controlled illumination of individual apartments with floor plans visible on screen and various filter options such as number of beds, aspect, availability, etc. Due to limited space in the marketing suite, we had to use a smaller than usual scale for this type of model which made it much more tricky to build in the wiring and individual apartment lights. The client asked us to create a “ghosted” but recognisable representation of an existing on-site building so our solution was to model it in clear acrylic, but still replicating a lot of the building’s architectural features – you should be able to pick this up in the photos.

Comments are closed
Our Latest Projects | Modelmakers | Rain Making Exhibition Model - September 2010

Rain Making Exhibition Model

 

For this particular project we were commissioned by a subsidiary of the Dow Chemical company to design and create an exhibition model that demonstrated the unique properties of their rail-track ballast stabilization system. The key feature of the product was that it bonded the ballast together whilst still allowing free drainage between the individual stones. This free draining aspect was the product’s major advantage and the display had to illustrate this in a visual demonstration. It also had to be compact and portable as it would be travelling to exhibition venues all over the world (the electrics needed to be compatible with multinational power systems). Our solution was to create a “Rain Machine” that showed a sample of the client’s product (using clear stones rather than conventional ballast) under a continuous deluge of water, set within a Perspex tank. The clear void underneath the ballast showed the “rain water” draining freely into the collection tank below where it was pumped back up to the header tank at the top to continue the cycle. This image shows the model without the water running for clarity. Since this picture was taken branding graphics have been added and the model has gone off to its first venue     in Germany. We’re hoping to add some on-site “in action” shots at a later date.

Comments are closed